Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 67 results ...

Abisuga, O (2020) Integrated collaborative facilities management framework for post-occupancy evaluation of higher education facilities, Unpublished PhD Thesis, , University of New South Wales.

Afzal, F (2019) A framework to improve sustainability performance of construction organisations, Unpublished PhD Thesis, , University of New South Wales.

Ahmadian Fard Fini, A (2017) Optimizing crew performance through integration of human resource strategies into planning of construction activities, Unpublished PhD Thesis, , University of New South Wales.

Aljassmi, H A (2013) Analysis of complex mechanisms of defect generation in construction projects, Unpublished PhD Thesis, , University of New South Wales.

Alrasheed, H (2015) A socio-ecological framework for improving the psychological health of foreign workers in developing countries: The case of saudi construction industry, Unpublished PhD Thesis, , University of New South Wales.

Boadu, E (2022) A framework for promoting health and safety through procurement in the construction industry in developing countries: A case of Ghana, Unpublished PhD Thesis, , University of New South Wales.

Chand, A (2015) A socio-ecological resilience perspective to enhance hospital service delivery resilience to extreme weather events, Unpublished PhD Thesis, , University of New South Wales.

Chandra, S (2006) Investigating green building assessment tools: a risk-analysis based approach, Unpublished PhD Thesis, , University of New South Wales.

Chandra, V (2007) An investigation of cultural learning during the hospital process from a facilities management perspective, Unpublished PhD Thesis, , University of New South Wales.

Cooke, J R (1973) Methods of documentation and administration of building contracts, Unpublished PhD Thesis, , University of New South Wales.

Coolican, A M (1989) A history of industrial relations in the Sydney building trades, 1870-1914 , Unpublished PhD Thesis, , University of New South Wales.

Cooper, A A (1971) An economic study of housing production and associated works in Australia, Unpublished PhD Thesis, , University of New South Wales.

Dave, M (2019) High performance prefab housing: towards an evaluation framework for design, sustainability and affordability, Unpublished PhD Thesis, , University of New South Wales.

Deng, Z M (1995) Extended state space modelling and influence diagrams for construction processes and aids, Unpublished PhD Thesis, , University of New South Wales.

Denny-Smith, G (2022) The social value of indigenous procurement policies in the Australian construction industry, Unpublished PhD Thesis, , University of New South Wales.

Forsythe, P (2003) The role of service quality as a determinant of customer satisfaction in residential construction, Unpublished PhD Thesis, , University of New South Wales.

Galea, N R (2018) Built for men: Institutional privilege in the Australian construction industry, Unpublished PhD Thesis, , University of New South Wales.

Habibi Rad, M (2022) Impact of lean construction on contractor performance and organisational resilience in post-disaster infrastructure projects, Unpublished PhD Thesis, , University of New South Wales.

Heng, H K S (2010) Information brokerage in hospital facilities management: A social network perspective, Unpublished PhD Thesis, , University of New South Wales.

Ho, M F C (2003) Ethics management in a construction organisation: Employees' attitudes to corporate codes of ethics, Unpublished PhD Thesis, , University of New South Wales.

Hong, Y C (2018) Modelling and evaluating the adoption of building information modelling in Australian and Chinese small and medium-sized construction organisations, Unpublished PhD Thesis, , University of New South Wales.

Hunt, P (2021) The business case for sustainable development in the Australian built environment, Unpublished PhD Thesis, , University of New South Wales.

Hutcheson, J M (1980) Administration of building contracts with particular reference to the builder's financial control, Unpublished PhD Thesis, , University of New South Wales (Australia).

Hutcheson, J M (1979) Administration of building contracts with particular reference to the builder's financial control, Unpublished PhD Thesis, , University of New South Wales.

Hwang, H (2011) Rational irrationality: The making of property decisions in firms as a part of resource allocation processes - a Korean example, Unpublished PhD Thesis, , University of New South Wales.

Kabirifar, K (2022) Effective construction and demolition waste management assessment: A case of Australian large construction companies, Unpublished PhD Thesis, , University of New South Wales.

Kaboli, A (2014) Cost and emissions analysis of earthmoving operations, Unpublished PhD Thesis, , University of New South Wales.

Karunaratne, B M (1994) A new method of analysis for cyclic construction operations using systems engineering approach, Unpublished PhD Thesis, , University of New South Wales.

Khalil, K (1994) An evaluation of managerial knowledge and skills of technical professionals in the construction industry in Malaysia, Unpublished PhD Thesis, , University of New South Wales.

Kim, S M (2019) Tenants' leasing motivators and decisions about the greenness of office buildings and their rental, Unpublished PhD Thesis, , University of New South Wales.

Kim, Y-S (1994) The development and application of a probabilistic model for risk analysis of life cycle cost predictions: For apartment buildings constructed by the Korea National Housing Corporation in Seoul, Korea , Unpublished PhD Thesis, , University of New South Wales.

Lam, K C (1997) The optimisation of financial decision in a contracting firm, Unpublished PhD Thesis, , University of New South Wales (Australia).

Lam, K-c (1997) The optimisation of financial decisions in a contracting firm, Unpublished PhD Thesis, , University of New South Wales.

Li, Y (2015) Sense of home in post-disaster reconstruction: A study of resident experiences of living in rebuilt houses after the wenchuan earthquake in China, Unpublished PhD Thesis, , University of New South Wales.

Liu, L (2003) Models of enterprise-level project performance: Comparative studies of organizational form, control mode and feedback mechanisms in the construction and it services industries, Unpublished PhD Thesis, , University of New South Wales.

Liu, Y M (2005) A holistic approach to developing generic vs. regionally specific frameworks for sustainable building tools, Unpublished PhD Thesis, , University of New South Wales.

Matsuzaki, H (1995) Construction industry unionism in Japan, Unpublished PhD Thesis, , University of New South Wales.

McLaren, M (2018) An investigation of swift trust formation in disaster management teams, Unpublished PhD Thesis, , University of New South Wales.

Mohd Ishak, S S B (2014) Resistance factors to technology innovation in construction organisations, Unpublished PhD Thesis, , University of New South Wales.

Moon, S (2014) Dynamic control of supply chain quality to improve process performance in construction, Unpublished PhD Thesis, , University of New South Wales.

  • Type: Thesis
  • Keywords: process performance; dynamic control; supply chain; quality control; concrete technology; site logistics; resource planning; process waste; radio frequency identification; sustainable construction
  • ISBN/ISSN:
  • URL: http://handle.unsw.edu.au/1959.4/53408
  • Abstract:
    The latest literature on quality management in the construction industry asserts that ISO 9000, a standard established in 1987 and drastically upgraded in 2000, has not been embraced as a holistic approach to improve overall performance. It is felt that management’s insistence on “punch-list inspection” creates barriers to adopting Total Quality Management (TQM), a model that fosters a culture of constant improvement. This research project studies the efficacy of quality as a catalyst to eliminate wasted construction process resources caused by ineffective inter-organizational supply-chain.The literature review showed that process planning and simulation in constructions still builds on the reactive Input-Process-Output (IPO) model found unfit to model the proactive management of supply-chain based quality (SCQ). The need for a feed-forward control approach required the introduction of process resource (Input) quality and causality functions predicting the quality of the output. Thus, the developed model, affirming the importance of feed-forward over feed-back control, was built on measuring quality as a function of process waste generation along the construction supply-chain. Referred to as Supply-Chain Dynamic Quality Control (SC-DQC), it extends the output oriented process model to pursue a continuous improvement of the agile construction operations. A construction site at Kensington, NSW was selected, to test the model while evaluating improvements and barriers to its implementation in the real world of construction. After extensive field observations and discussions with the contractors, two universal material supplies were selected for experimental studies: 1) Concrete Placement and 2) Rebar Installation. Both test cases exhibited poor supply chain quality and information sharing, albeit with different consequences. In a first phase, feed-forward control technologies and methods were designed and field-tested to prove the hypotheses predicting technical feasibilities and measurable improvements. Ruggedized Radio-Frequency Identification (RFID) tags were added (embedded) to the flowing concrete as five trucks emptied their drums into a pump hopper after laboratory pre-tests. A RFID reader not only detected fourteen out of the fifteen embedded tags, but a tag’s readability increased with the decreasing water-content indicating the curing of the concrete. While RFID tags attached to rebar bundles opened up new information channels along the supply chain, the significant improvements resulted from feed-forwarding ‘process intelligence' into the rebar fabrication shop ensuring a high quality delivery process. The comparative field experiments proved the drastic effect of DQC on the work efficiency of placing rebar for the test beams. The high supply quality ensured by the Master Bundle (MSB) concept allowed the steel fixers to increase their productive time from 31% to 77.4%. As expected, this radical change was accompanied by a drastic reduction of process waste from 41.5% to 6.2% and contributory work from 19.7% to 10.5%. The relevance of the presented research lies in complying scientific evidence that the DQC model, built on a proactive and holistic management philosophy, targets the elimination of process wastes caused by poor quality supply processes. The realization of the substantial improvements will rest on the industry’s ability to adopt mutually supportive relationships and agile communication across the supply chain.

Ong, E M S (2008) Trust, commitment, satisfaction and learning in construction project teams, Unpublished PhD Thesis, , University of New South Wales.

Paterson, I (1981) Contractors' risk and insurance in the Australian building industry, Unpublished PhD Thesis, , University of New South Wales.

Perera, W A S (2018) An investigation into developing productive construction environments to improve quality performance in Australian building construction, Unpublished PhD Thesis, , University of New South Wales.

Qu, Y (2017) An investigation of opportunistic behaviour in public-private partnerships, Unpublished PhD Thesis, , University of New South Wales.

Rahnamayie Zekavat, P (2014) Performance assessment of agile communication in construction, Unpublished PhD Thesis, , University of New South Wales.

Recsei, R A (1998) A generalised decision support system for contaminated site management, Unpublished PhD Thesis, , University of New South Wales (Australia).

Ridyard, J (1976) Computer based management games for the building industry, Unpublished PhD Thesis, , University of New South Wales.

Salehudin, M S B (2012) Developing sustainable resorts in developing countries: A proposed new generation rating framework for Malaysia, Unpublished PhD Thesis, , University of New South Wales.

Seemann, K W (1997) The socio-technical sustainability of shelter systems and hardware in remote indigenous Australian communities, Unpublished PhD Thesis, , University of New South Wales.

Shahbazi, B (2020) A mathematical optimization approach to account for career development, job security, and job satisfaction in human resource planning in construction organizations, Unpublished PhD Thesis, , University of New South Wales.

Slay, P G R (2019) Development of an ontology for project management success criteria and associated technical and personal competencies in an Australian engineering context, Unpublished PhD Thesis, , University of New South Wales.

Sufianto, H (2013) A fire safety improvement framework for residential buildings: A socio-ecological behaviour modification approach, Unpublished PhD Thesis, , University of New South Wales.

Sunindijo, R (2012) Skills for developing safety climate in construction projects, Unpublished PhD Thesis, , University of New South Wales.

Ta'i, B (1994) Critical evaluation of stormwater management practices on urban construction sites in the Sydney region, Unpublished PhD Thesis, , University of New South Wales.

Teo, A L E (1997) Strategic market positioning in the construction industry: Model for evaluating mobility and diversification, Unpublished PhD Thesis, , University of New South Wales.

Teo, M M M (2009) An investigation of community-based protest movement continuity against construction projects, Unpublished PhD Thesis, , University of New South Wales.

Tran, H V (2013) Contractor internal profiling of owners, Unpublished PhD Thesis, , University of New South Wales.

Trethewy, R (2002) Influences on subcontractor OHS management outcomes in construction, Unpublished PhD Thesis, , University of New South Wales.

Trethewy, R W (2003) Influences on subcontractor OHS management outcomes in construction, Unpublished PhD Thesis, , University of New South Wales (Australia).

Uher, T E (1990) The effect of risks and uncertainties on subcontract bid prices, Unpublished PhD Thesis, , University of New South Wales.

Wang, R (2015) The virtual learning experience: Learning styles, task complexity and presence in the context of emerging VR technologies, Unpublished PhD Thesis, , University of New South Wales.

Wang, Z (2019) Effects of main contractors' service quality on subcontractors' behaviours and project outcomes in the Chinese construction industry, Unpublished PhD Thesis, , University of New South Wales.

Wang, Z (2014) Housing pathways and homeownership determinants of the young middle class in beijing, China, Unpublished PhD Thesis, , University of New South Wales.

Xiao, P (2018) Development of colletive intelligence for building energy efficiency, Unpublished PhD Thesis, , University of New South Wales.

Yamaguchi, H (2002) Risk allocation in privately financed projects, Unpublished PhD Thesis, , University of New South Wales.

Zaid Alkilani, S (2018) Performance measurement and improvement model for small and medium contractors in developing countries, Unpublished PhD Thesis, , University of New South Wales.

Zhang, Q (2021) Key influencing factors of corporate social responsibility implementation in the Chinese construction industry, Unpublished PhD Thesis, , University of New South Wales.